2014 Annual Report

Check out the 2014 Annual Report here, or on our Reports page.Screen Shot 2014-10-21 at 11.47.17 AM

Synopsis
Season 2 of the Bangarang Project was one of ups, downs, and ultimate success. The off-season was a time of intense literature review, frantic scientific preparation, major vessel improvements and landmark fundraising success. The field season was nearly lost due to the failure of a rebuilt engine, a debacle that has escalated to a lawsuit that remains unresolved. Despite this setback, the Bangarang finished the season stronger than ever: a brand new engine smoothly broken in, an arsenal of world-class scientific instrumentation vetted and sea-trialed, and a month of fieldwork of unqualified success. I now enter the off-season with more drive, enthusiasm and determination than ever.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s